Hexapod

Design & manufacturing of a set wich include base, nacelle and fork type interfaces forming a hexapod.

Type of project

Part design & manufacturing small series

Field

Industry

Processes

  • CAD - Part & tool design
  • Sizing finite element
  • CAM - Part & tool machining
  • Composite sandwich
  • CMC - Compression molded composite
  • Infusion

Problematic

Dimensional compliance in extreme weather conditions.
Sealing parts to prevent inclusion of water during the lifetime of the product.
Positionning & sticking metal inserts at 1/100ème.

4-11_principal.JPG

Dated / History

24/01/13 : Delivery of final technical and commercial offer

01/07/13 : Confirmation order receipt

01/08/13 : Tooling design validated

23/10/13 : FAI validated

04/11/13 : Delivery of the set 1

01/03/14 : Delivery of the set 2

31/07/15 : Delivery of the set 3 & 4

Home

ZAC de la poulasse
4, avenue Bernard Palissy
83210 SOLLIES PONT

Contact Us

(+33) 4 98 01 29 55

Home

© Home 2024, all rights reserved Réalisation Metycea